Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Gas Pipeline Blowdown Time - Regulations


This topic has been archived. This means that you cannot reply to this topic.
No replies to this topic
Share this topic:
| More

#1 Thomas-pearl

Thomas-pearl

    Brand New Member

  • Members
  • 7 posts

Posted 25 June 2014 - 07:17 AM

I'm looking for regulations about maximum time of natural gas pipeline blowdown. It may be API, ISO, Industrial standards, Company's standards/practices.  Is there any difference between sales gas and raw gas and between sour gas (with H2S)  and sweet gas?

I would be grateful for any information.

 






Similar Topics