Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Tower Tray Installation


This topic has been archived. This means that you cannot reply to this topic.
1 reply to this topic
Share this topic:
| More

#1 Rahimzadeh

Rahimzadeh

    Gold Member

  • Members
  • 275 posts

Posted 05 March 2015 - 05:45 AM

Dear:

Please share your idea with me about connection of tray to body of tower .

It must be rigid or flexible.

In rigid case due temperature variation the tray will be deformed.

What can do for preventing of deformation?

 

Best regards

 

M.R.Rahimzadeh



#2 Zauberberg

Zauberberg

    Gold Member

  • ChE Plus Subscriber
  • 2,727 posts

Posted 05 March 2015 - 08:33 AM

Mr. Rahimzadeh,

 

See attached pages from Kister's book "Distillation Operation". It should resolve your query in all details.

Attached Files


Edited by Zauberberg, 05 March 2015 - 08:34 AM.





Similar Topics