Blowdown Orifice Plate Installation

depressurizationblowdown installation

This topic has been archived. This means that you cannot reply to this topic.
4 replies to this topic
Share this topic:
| More

#1 AymanAyadi

AymanAyadi

    Brand New Member

  • Members
  • 8 posts

Posted 10 April 2015 - 09:11 AM

Attached File  MX-3100N_20150410_230333.pdf   271.38KB   40 downloadsDear All,
 
Due to the absence of a reference document describing the correct installation of blowdown orifice plate (vertical or horizontal position), could you please advice how can I install the orifice.
For more detail:
- RO to be installed on GL slug catcher en horizontal position (design pressure 150 barg),
- According our BoD a minimum distance between the BDV and the RO is 500 mm,
- Current proposal need a general shut-down for 24 hour of one of our platform (8000 bbls of oil lost), due to hot work. (venting, inerting, cutting, surface preparation, welding, industrial radiography, installation & leak test)
- Alternative solution (cold work): general shut-down of 3 hour. (venting, inerting, installation & leak test)
- Please refer to the attached schematic.
 
Best Regards
Ayman


#2 fallah

fallah

    Gold Member

  • ChE Plus Subscriber
  • 4,930 posts

Posted 10 April 2015 - 09:51 AM

Ayman,

 

Because the BDV is normally closed, to prevent the accumulation of any liquid at either side of the valve especially at downstream, the set of BDV and following RO should be in horizontal position with BDV at high point that will lead to free drain at upstream/downstream lines of the valve...


Edited by fallah, 10 April 2015 - 09:52 AM.


#3 AymanAyadi

AymanAyadi

    Brand New Member

  • Members
  • 8 posts

Posted 10 April 2015 - 10:02 AM

@ Fallah,

 

Many thanks for your prompt answer.

We will check the piping design.

 

Regards

Ayman



#4 flarenuf

flarenuf

    Veteran Member

  • Members
  • 104 posts

Posted 15 April 2015 - 05:00 AM

hi the attached paper may assist you on this

flarenuf

Attached Files



#5 AymanAyadi

AymanAyadi

    Brand New Member

  • Members
  • 8 posts

Posted 20 April 2015 - 05:00 AM

Many Thanks flarenuf.