Hi All,
I have multiple PSV in 6.2 barg steam line. The PSV arrangement as in the attachment. The high alarm is at 7.24 barg. My questions are:
a) Why the PSVs are arrange as such?
Can I switch the PSVs? I put the 7.58 barg PSV before 8.27 barg PSV?