I am working on a project where we study the operation from high pressure to low pressure. The high pressure operation involved operating at 36 barg and at low pressure, it is 18 barg. The RO across the BDV was sized for the high pressure operation.
Now my question is can the same RO be reused for low pressure operation or should it be replaced?