|
Design Calculation Seive Tray Wet Scrubber
#1
Posted 02 July 2015 - 06:15 AM
#2
Posted 02 July 2015 - 06:32 AM
Do not make multiple posts.
Also, if you want to receive answers, your question needs to contain some input data and not only a general request.
#3
Posted 02 July 2015 - 07:37 AM
First of all sorry for multiple request.
I am looking for deaign calcularion of seive tray wet scrubber for below input and output as below.
Input.
Fuel used -baggase+eice husk
Gas volume-91m3/sec.
Gas temp.160deg c
Duct at inlet- 7 gm/nm3.
Outlet parameter to be scrubbwr design for ar below.
Outlet dust concentration- below80mg/nm3
Outlwt temp.-80deg c
You are requeated to please provide the design calculaton to meet outlep parameters with minimum pressure drop across the system.
Regards.
Apc engineer
#4
Posted 02 July 2015 - 10:17 AM
It's not likely that we will do your work for you.
Bobby
#5
Posted 02 July 2015 - 02:12 PM
APC:
You are a new member who has made 7 posts of the same topic and title. I have deleted all the other posts; now it is up to you to STOP THIS PRACTICE AND READ THE FORUM GUIDELINES.
If you persist with this very ignorant practice, I will delete all your posts and recommend you be banned from our forums. As Bobby has stated we don't furnish free design engineering. That is not what our Forums are for. Do your own work and submit it for review and comments.
#6
Posted 02 July 2015 - 07:38 PM
I will read the guideline for the same not to repeat the same.
please help me to provide some guidlies or refrance handbook. So that i can do some exercise for your review/comments.
Apc
Edited by apc engineer, 02 July 2015 - 07:41 PM.
#7
Posted 03 July 2015 - 02:23 AM
Please help me to design wet scrubber to clean flue gas of baggase fired boiler.
#8
Posted 03 July 2015 - 02:35 AM
apc,
consider this paper and again consider Perry's chemical engineers' handbook to support your work
Breizh
Similar Topics
Design And Fabrication Of Reflux DrumStarted by Guest_Femi_* , 22 Apr 2024 |
|
|
||
Jt Based Hcdp Design V/s Mechanical Refrigeration Hcdp Unit.Started by Guest_BabRafiq1_* , 19 Apr 2024 |
|
|
||
Caloric Temperature CalculationStarted by Guest_bckesim_* , 10 Apr 2024 |
|
|
||
Rupture Disc DesignStarted by Guest_chaupradip_* , 13 Apr 2024 |
|
|
||
Falling Film Reactor Design CalculationStarted by Guest_Emranm02_* , 07 Apr 2024 |
|
|