Dear All
I am facing a problem during commissioning of turbine :
Fluctuations is condenser vacuum ...while in operation suddenly vaccum drops from 0.95 barg to 0.7 barg and raise in exhaust steam temp & after 30 mins vaccum increases automatically
I have check everything cooling water pressure & temperature well in desgin range ejector , ejector steam , gland steam air ingress everything is OK. I can share the data if needed
Can anyone guide me about the drains of ejector & gland steam terminating in condenser (non-condensable) are they causing problem { Cyclic behaviour of vacuum )?
Regards
Hassan