Dear Sir,
I try to find the best practice for breaking material(CS) that connect to flare line(SS).
Flare line is ss304L, temperature may down to -29C but the new line that will connect is CS.
Now i need to know about how much the distance from flare line that safe for breaking class to CS and how to consider that distance is safe.
Best regards,
SK.
|
Pipe Breaking Material Class
#1
Posted 12 November 2015 - 10:38 PM
#2
Posted 13 November 2015 - 01:20 AM
SK,
Refer the link below and the attachment in post #7 provided in the link:
http://www.cheresour...3151#entry23151
Regards,
Ankur.
#3
Posted 13 November 2015 - 02:08 AM
Dear Ankur,
How come of min. 600 mm from joule thomson cooling point? Do you have some more detail for consider this dimension?
Best regards,
SK.
#4
Posted 13 November 2015 - 03:29 AM
I try to find the best practice for breaking material(CS) that connect to flare line(SS).
Flare line is ss304L, temperature may down to -29C but the new line that will connect is CS.
Now i need to know about how much the distance from flare line that safe for breaking class to CS and how to consider that distance is safe.
SK,
There is no specific practice to apply material breakdown in the line connected to, say, a flare header. Attached is a sample in an executed project in which there has been considered 50 m distance from the connection point of a line (line no. 20002) to flare header (line no. 20001) for breaking material...
Attached Files
Edited by fallah, 13 November 2015 - 03:32 AM.
Similar Topics
Higher Pipe Line Dia Specification In UnisimStarted by Guest_Praveen Perumandla_* , 27 Feb 2024 |
|
|
||
Sizing Of Cooling Water Pipe LineStarted by Guest_Asif Azeez_* , 08 Jan 2021 |
|
|
||
Gas In Pipe SupportStarted by Guest_Stellaandoor_* , 26 Jan 2024 |
|
|
||
Recommended Velocity For Highly Viscous Liquid In A PipeStarted by Guest_Quimarah_* , 13 Oct 2023 |
|
|
||
Aspen Flare System Analyzer (Training Material)Started by Guest_opel_* , 22 Feb 2016 |
|
|