Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

0

New Line For Filter.


1 reply to this topic
Share this topic:
| More

#1 ali99

ali99

    Junior Member

  • Members
  • 14 posts

Posted 04 July 2022 - 07:09 PM

Gent's 

 I Am working at 1-Hexne plant , after making our catalyst batch we transfer it to filter then to 4 identical positive displacement pumps. filling the filter through the inlet block valve very slowly to protect the other pumps from losing the flow .can we provide new line with flow orfice or any suggestion  .

 

Thanks, 



#2 breizh

breizh

    Gold Member

  • Admin
  • 6,346 posts

Posted 04 July 2022 - 09:00 PM   Best Answer

Hi Ali,

Can you provide a simple sketch for better understanding ? actual situation and expectation .

To me the product from the filter should be transferred to a buffer tank from where the pumps should be connected .

Waiting for your sketch or PID .

Breizh






Similar Topics