Dear Sir / Madam
I have simple and basic questions about Pre-commissioning. As I know, Pre-commissioning begins after mechanical completion for a portion of a facility
After plant start precommissiong,
1. How to find the air source in the platform to be connectted to the pipe we requried to clean (if pipe requried to be clean located in the platform)
to blow dry air?
2. What kind of air should we used if we need to dry the remining water in the pipe ( after all water flush step finished)
ex. hot dry air or cold air?
3. How can we determine that dry air or service water is good or safe enough to clean the process pipe?
Or it is depended on the fluind carrying in the pipe. If the process fluid is running in the pipe, we should always use
service water to clean the pipe?
Could anyone kindly provide some guideline or information to me?
Thank you very much.
Regards,
|
|
Precommissioning Procedure Question
Started by deltaChe, Dec 10 2010 10:58 PM
No replies to this topic
Share this topic:
#1
Posted 10 December 2010 - 10:58 PM
Similar Topics
Beginner Question: Inlet Separator Design In Aspen Hysys (Natural Gas,Started by Guest_NewEng2030_* , 12 Feb 2026 |
|
|
||
I Have A Question From Himmelblau's Introduction To Chemical EnginStarted by Guest_Hindxxx//_* , 27 Jan 2026 |
|
|
||
Hysys Depressuring Utility Pressure QuestionStarted by Guest_cammycheme_* , 15 Aug 2025 |
|
|
||
Separator Sizing Step By Step ProcedureStarted by Guest_krishnamurthy_* , 06 Apr 2023 |
|
|
||
General Question About VendorsStarted by Guest_panoska_* , 25 Aug 2024 |
|
|

FB