Dear experts
I am currently working as equipment design engineer and purchasers send lots of documents for every single project or tender to be responded. I want to know if any one can refer me to some instructions on how to use these huge amount of received documents. I have listed some topics below:
PMS (Piping material spec)
Pressure vessel spec
Process Design Criteria
Specification for welding
:
:
For example recently I had to design a pressure vessel, which, by its design conditions, no impact test was obligatory. But when I checked the project's piping material spec, I noticed they have added impact test requirement for the vessel's inlet piping. Then I wondered if impact test was also necessary for my vessel or not!
Thanks in advance.