Hi,
The project that I am working on involves a SAG mill, and the ground slurry will flow to the cyclone, the cyclone overflow goes to the trash screen, and the cyclone underflow goes back to the SAG mill for regrind.
I am trying to size the cyclone underflow and overflow pipes, as well as the pipe that connects the trash screen underflow to the secondary mill pumpbox.
What do I need to consider when I size for the 3 lines? Thanks.
Sophia