Process Design Ecosystem
#1
Posted 17 July 2018 - 08:10 PM
#2
Posted 21 July 2018 - 07:56 AM
The licensor's engineers prepares the design package that includes heat and material balances, PFD's, P&ID's, equipment datasheets, instrument datasheets, et cetera.
The engineers at the EPC contractor use those documents to prepare requisitions (purchase orders) for all equipment and instrumentation, material take off (piping, valving, insulation, structural steel, concrete, et cetera). In addition required new utility systems, waste water treating, flare system, et cetera, are designed by the EPC contractor.
And the EPC contractor builds the whole unit at operating companies site.
The Operating Company initiates the project. They determine what new process units are required at what capacity, contact licensors and select one of them. Or they hire a design company to do that work. For big projects with multiple new units they may hire a Managing Contractor (usually another EPC company) to manage the whole project and supervise the work of licensors and EPC contractor.
How exactly it is organized depends on the Operating Company. Big companies can do a lot themselves and usually don't need an MC.
An Open Art design is a design that does not require a licensor but can be done by any experienced design group.
Similar Topics
Mtbe Process Flow Diagram Master Thesis.Started by Guest_sayoub_* , 15 Feb 2024 |
|
|
||
Let Down Vessel In Methanol ProcessStarted by Guest_Manue_* , 21 Mar 2024 |
|
|
||
Design Gauge Pressure Inlet To A Centrifugal Compressor.Started by Guest_Mohammad3799_* , 03 Mar 2024 |
|
|
||
Design Criteria For Sizing Sump Drum Of Close Drain System In Tank FarStarted by Guest_AnbIran_* , 28 Feb 2024 |
|
|
||
Co2 Degasser Design ParametersStarted by Guest_AnnaV_* , 26 Feb 2024 |
|
|