In our steam methane reformer,we are adjusting the upstream valve of the total process steam flow control valve to control the total process steam flow whenever the load changes by more than 3-4 %.
Is this operation normal?
Actually quick opening type plug is used in the total process steam control valve.As quick opening type plug allows large amount of flow with very less opening,this could be one of the reason for the adjustment.Is this the real cause?
Does anyone using any other type of plug i.e.linear or equal percentage type in the total process steam control valve?
Or
Is there any other possible problem with our existing control valve?
|
0
Reformer Steam Control Valve In Steam Methane Reformer
Started by Refeng, Jul 24 2018 03:11 AM
No replies to this topic
Share this topic:
#1
Posted 24 July 2018 - 03:11 AM
Similar Topics
Valves On Low Pressure Steam ServiceStarted by Guest_Ali4269278331_* , 15 Apr 2024 |
|
|
||
Can Anyone Provide Me The Reference Datasheet For Deluge Valve?Started by Guest_Radha Krishnan Siva Kumar_* , 16 Apr 2024 |
|
|
||
Answered
Steam Pressure Requirements For Limpet Batch ReactorStarted by Guest_golegolegole_* , 10 Apr 2024 |
|
|
||
Steam AccumulatorStarted by Guest_Valeriacortez11_* , 15 Apr 2024 |
|
|
||
Hydrocarbon Dew Point Control UnitStarted by Guest_BabRafiq1_* , 05 Apr 2024 |
|
|