Please help me in solving this problem..or at least the way of it.
Warm moist air (dry bulb temp=85c wet bulb temp=46c)enters a tower at a rate of 5000kg/m^2.h.it is to be cooled and dehumidifid to a wet bulb temperature of 31c using water available at 26c.the overall gas phase mass transfer coeefficentis estimated to be 2300kh/h.m^2. The water rate is 1.25 times the minimum. Calculat the water rate and its outlet temperature .. the water conduced per hour...the packed height
|
0
Calculations Of Cooling Tower
Started by Sajad9teen, Nov 22 2018 02:44 AM
1 reply to this topic
Share this topic:
Similar Topics
Iso 28300 Venting CalculationsStarted by Guest_Mikemak_* , 22 Feb 2024 |
|
|
||
Minimum Tower DiameterStarted by Guest_AnbIran_* , 17 Nov 2023 |
|
|
||
Sizing Of Cooling Water Pipe LineStarted by Guest_Asif Azeez_* , 08 Jan 2021 |
|
|
||
Heating And Cooling Circuit DesignStarted by Guest_AAZIZ_* , 20 Jan 2024 |
|
|
||
How To Calculate Cooling Rate Of CrystallizerStarted by Guest_snehchem_* , 04 Jan 2024 |
|
|