Hi Vaibhav,
Part A:
In our company the criteria for excluding fire case is as follows
1) If the volume of liquid handled in the vessel is less than 500 Liters
2) The fluid in the system should be non-toxic
3) Only fire is the applicable scenario
The only case when the filter is not provided with a PSV is when the volume is less. If the volume is more and the filter is located in a fire zone, definitely PSV is required.
Part B:
Refer Clause 4.4.13.2.5.3 of API 521, which states that the liquid filled vessel will be subjected to thermal expansion for limited time after which vapour generation becomes determining case.
Revert in case of any query.
Similar Topics
Pump Sizing ConsiderationsStarted by Guest_panagiotis_* , 07 Apr 2024 |
|
|
||
Barometric Legs Line SizingStarted by Guest_panagiotis_* , 17 Mar 2023 |
|
|
||
Time Required To Heat Up A Fluid In A VesselStarted by Guest_panagiotis_* , 24 Jan 2023 |
|
|
||
Let Down Vessel In Methanol ProcessStarted by Guest_Manue_* , 21 Mar 2024 |
|
|
||
Sizing Of Vertical/horizontal Flash DrumStarted by Guest_Mohammad3799_* , 10 Mar 2024 |
|
|