Chiller


This topic has been archived. This means that you cannot reply to this topic.
No replies to this topic
Share this topic:
| More

#1 angelicaacostas

angelicaacostas

    Junior Member

  • Members
  • 16 posts

Posted 27 September 2006 - 02:09 PM

Good afternoon



this message is for contacting to a company that it designs and it makes and it provides to chiller with the purpose of asking for a proposal to them for a project in PDVSA "El palito Refinery" located in Carabobo state, Venezuela.

The title proyect is "New Tank and Isobutane compressors, this consists in the installation of a new isobutane tank and replacement of the cooling system compressors.

In the project is considered the Chiller installation (Cooling system whit propane). For thr cooling of a fluid that can be at two different conditions and this is next described:

1. Cooling of the isobutane vapour accumulated in the 12 in piping equivalent to 62,000 lb/h, vapour isobutane a 50°F and 60 psig.

2. After the previous step the system is required to cool 1,039,000 lb/h of liquid isobutane at 20°F and 50 Psig from the discharge of the ship.

In both previous scenes is necessary to obtain as result liquid isobutane at 11°F.

We need this proposal as soon as possible because we will be preparing the licitation process. We'll also need the asociated cost and the delivery time in your proposot.


For more information please they can contact mail to me.
acostamb@pdvsa.com

You will find in this e-mail a project scheme best regards
Attentively

Maria Acosta
Process engineer
Seccion Design and Project