We have a dryer to remove moisture from the compressed air, During regeneration of media vessel will have to be depressurized need to design a vent size to depressurize in 15 mints .
Vessel cap :15 m3, depressurization pr -: 7 to 0.2 kg/cm2g. temp 35 Deg C
I would to build this in excel sheet please provide the guidance