Hi to all,
1. During the blocked outlet scenario in group header and group separator (Two Phase), the outlet line of PSV connected to either flare header or closed drain?
2. For Indirect bath heater and Heat exchanger TSV is connected to closed drain but sometimes its connected to flare header. which one is correct?
Thanks
Edited by 274@P6, 14 December 2020 - 12:48 AM.