Latest Content
Latest Community Postings
Recent Blog Entries
Community Downloads
ChExpress Blog
Ankur's Tech Blog
Community Admin Blog
Energy Efficient Hot and Cold Water
Electrical Process Tomography
Biodiesel: The Road Ahead
Methanol Plant Capacity Enhancement
Plate and Frame Heat Exchangers: Preliminary Design
Compressor Surging Under Control
Plant and Equipment Wellness, Part 1: Observing Variability


Share this topic:



smalllogo.gif (6368 bytes)

ChE Systems -- Specification

chesystems.gif (4881 bytes)

Use the form below to tell us about your request.  If you cannot complete all of the information or if some of the information does not apply, please complete as much as possible.  If you prefer, you can download this form in Adobe Acrobat format and then fax or email it to us later.

CUSTOMER INFORMATION
Name:
Company:
Title:
Mailing Address:
City:
State:
Zip Code:
Country:
Phone:
Fax:
Email Address:
Type of Business:
Budget or Firm Inquiry
Date Proposal Required:
Is Equipment to be shipped outside the U.S.?
If so, where?
Any additional Customer Information?
Will module be shipped to a location other than the address above?
Notice of Non-Disclosure:
All participants in the ChE Systems program are bound by a non-disclosure statement.  You can request a copy of the non-disclosure statement or you can include your company's non-disclosure statement in your request for proposal.
PROCESS INFORMATION
Use the provided space to describe your processing needs.  Also complete the questions below regarding your process.  If you need to fax additional pages, send them to (561) 658-6489 or you can email additional documents to support@cheresources.com.

Be sure to include your name and your company name on all additional documents.

Feed Compositions
Specify Weight Percents, Flowrates, and Temperatures of ALL Components
Does the Feed Contain Solids?   Comments:
Is the Feed Corrosive?   Feed pH:
Does the Feed Contain Chlorides?   Level in ppm:
List Needed Pressure Vessel Code and Connection Standard:
UTILITY INFORMATION
High Pressure Steam (psig):
Low Pressure Steam (psig):
Hot Oil Type:
Hot Oil Supply Temperature (°F):
Max. Capacity of Hot Oil System (Btu/h):
Cooling Water Supply Temperature (°F):
Cooling Water Return Temperature (°F):
Is There a Limit of the Availability of Cooling Water?

If Yes, Limit in GPM:

Chilled Water Supply Temperature (°F):
Chilled Water Return Temperature (°F):
Type of Coolant Used for Chilled Water:
Max. Capacity of Refrigeration System (Btu/h):
Electrical Power Available: (Volts) (Phase)   (Hz)
INSTRUMENTATION
Type of Control System Desired:
Who Will Supply Control System?
Customer Preference for Field Instrument Manufacturers: Transmitters:   
Control Valves:
Single Loop Controller:
Pressure Gauges:
Relief Valves:
Thermometers:
Type of Instrumentation:
Instrument Air Supply Pressure (psig):
GENERAL INFORMATION
Materials of Construction: Process Equipment:
Process Lines:
Utility Lines:
Whose Piping Specification Will Be Used?
Type of Structural Steel:
Whose Painting Specification Will Be Used?
Who Will Supply Heat Tracing (if necessary)?
Heat Trace Type:
Who Will Supply Insulation?
Will Fireproofing Be Applied to Structural Steel?
Maximum Plot Size (ft): Width: Length:
Maximum Height (ft):
Area Electrical Classification and Division:
Where Will Unit Be Installed?
Design Windload (mph):
Seismic Zone:
Any Additional Information?
If You're Faxing Additional Information, How Many Total Pages?


 


smalllogo.gif (4001 bytes)
JOIN OUR COMMUNITY

  • Stay up to date on new content
  • Post questions and answers in our forums
  • Access downloads and attachments
  • Read member blogs and start your own blog
  • Connect with members via our friends feature
  • Receive and post status updates