Submitter
File Information
- Submitted: Feb 28 2011 01:05 PM
- Last Updated: Feb 28 2011 01:05 PM
- File Size: 129.33KB
- Views: 8903
- Downloads: 1,175
Download Reliability - An Effective Tool To Extend the Turnaround Period






Unedited contribution from the author.
Abstract
The purpose of turnaround is better utilization of resources and enchantment of safety, environment, reliability & contentious operation of the olefin plant at rated capacity. There is no clear distinction between two turnaround intervals of an olefin plant. There are olefin units with three & five year turnaround interval period. Mechanical integrity and unit effiencey determine majority of the schedule interval between two turnaround. To sum up, a cultural shift is necessary to intellectually agree on total reliability program of an olefin plant. This will focus on proactive to prevent the surprises & deviation from operation & safety. Moreover, it will assist in extending the turnaround interval beyond the five year. These papers will emphasis, how total reliability program can affect plant performance and extend the turnaround period. The extended turnaround interval will provide two fold benefits. First, it will increase the on-stream factor, resulting in increase of production & profits. Secondly, it will reduce the turnaround cost over entire life of plant.
Abstract
The purpose of turnaround is better utilization of resources and enchantment of safety, environment, reliability & contentious operation of the olefin plant at rated capacity. There is no clear distinction between two turnaround intervals of an olefin plant. There are olefin units with three & five year turnaround interval period. Mechanical integrity and unit effiencey determine majority of the schedule interval between two turnaround. To sum up, a cultural shift is necessary to intellectually agree on total reliability program of an olefin plant. This will focus on proactive to prevent the surprises & deviation from operation & safety. Moreover, it will assist in extending the turnaround interval beyond the five year. These papers will emphasis, how total reliability program can affect plant performance and extend the turnaround period. The extended turnaround interval will provide two fold benefits. First, it will increase the on-stream factor, resulting in increase of production & profits. Secondly, it will reduce the turnaround cost over entire life of plant.
Disclaimer: All software provided "As-Is" with no warranty, expressed or implied, available. See our Terms of Use for more information.
Random Files
- 326 Total Files
- 28 Total Categories
- 42 Total Authors
- 1,058,823 Total Downloads
- Multiphase Slug Length and Volume Calculator Latest File
- ankur2061 Latest Submitter
user(s) are online (in the past 15 minutes)
members, guests, anonymous users