Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Manual Depressurizing And Define Mdmt


This topic has been archived. This means that you cannot reply to this topic.
No replies to this topic
Share this topic:
| More

#1 m42364236k

m42364236k

    Gold Member

  • Members
  • 94 posts

Posted 02 May 2014 - 10:32 AM

dears

 

i have question about manual depressurizing

 

1-for manual depressurizing is it mandatory down stream of glob vale we have no pocket with slope through the ko drum(like psv lines)?

 

2-do we have any standard time for manual depressurizing?(for determining the  minimum temperature)

 

7 hours on operator shift or ....

 

3-if we reach the low temperature is it needed to have extend stem? Or with chain we can open or close the valve

 

4- the rules for calculating the minimum temperature is as same as the cold depressurizing that we do by dynamic hysys or we have other rules?

 

 

thanks






Similar Topics