@sherkhan
now from this post and combining your previous posts, I understand that you have an existing operating plant with MDEA for sweetening 30 mmscfd while the actual operation is for 10 mmscfd; and you want to reduce the operator reboiler duty to match the requirement by reducing the circulation
whenever a post is made in Chersources forums, do ensure the following
1) donot be skimpy with back ground information (you may need to mask the actual client, company name etc, but give as much background information as much possible)
2) be clear and forthcoming with your requirement; use simple sentences and convey the actual requirement ( from your previous post, I understood it as a simulation issue; from this post I understand you are trying to use hysys as an optimization tool to improve the economics by reducing the actual reboiler duty in an existing plant)
3) be precise and give the necessary input data ( equipment details, gas flow, op P/T); the accuracy of a solution will depend on the information; the forum members wont be on a fishing trip to help out with a questionnaire for the data; you have to understand and realize and give the necessary data
and
4) give what is the bottleneck, what you attempted and where you are struck and where you need assistance and input from others
regards
neelakantan
(neelakantanr@rediffmail.com)