In Hysis
I am sizing control valve failure for a fuel gas line
What is the formula used in hysis for required relieving load for a control valve failure case for gas.
I used Qmax which is given in the attached spreadsheet for my relief load calculation through control valve.
I have got a max load = 4435 lb/hr.
the calculated load is 4426 lb/hr in hysis
But the required relieving load says = 2795 lb/hr based on which the orifice area has been sized.
Kindly explain the formula involved in Hysis for Required relieving load