Jump to content

  • Log in with Facebook Log In with Google      Sign In   
  • Create Account


ChExpress Blog - 11/12/14

Read the latest news from the chemical industry in Christa's blog.

Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Air Vessel Sizing for Water Hammer Prevention

Well Casing Blowdown


This topic has been archived. This means that you cannot reply to this topic.
No replies to this topic
Share this topic:

#1 Guest_mohammadreza piri_*

Guest_mohammadreza piri_*
  • guestGuests

Posted 22 April 2009 - 09:24 PM

Dear all,
Currently I am working on a wellhead platform offshore project and and would like to know more about well casing depressurizing. Appreciated to anybody to clarify these items:
1-Normally we need to consider a high pressure alarm for casing; which setting we should consider?
2-how we can realize that design temperature of blowdown downstream piping is O.K?Can we use HYSYS dynamic depressurizing utility for this estimation? If we can then which initial temperature and pressure we need to consider?


Regards-Mohammad