Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Hydraulic Flush Pipe Question Before Plant Commissioning


This topic has been archived. This means that you cannot reply to this topic.
No replies to this topic
Share this topic:
| More

#1 deltaChe

deltaChe

    Gold Member

  • ChE Plus Subscriber
  • 153 posts

Posted 01 December 2011 - 07:52 AM

Dear Sir/Madam

The process is decribe below:

Slurry from PTA rotary vacuum filter feed drum is fed on a flow rate control via RVF pump to rotating pressure filter.Separation of solid purified terephthalic acid from water-soluble impurities is performed in two rotary filter stages in the continuous drum filter type A/B.Filtrate is pumped to reslurry tank by RVF Filtrate pump . The gas from PTA RPF separator is sent through PTA RPF separator condenser and mist separator to PTA RPF gas compressor where gas is compressed from 3barg to 7barg.

I have several questions how to flush the pipe before this PTA plant commissioning.
(the question is in my attached pdf fie)

This question may be very trivail and hope it not bother you too much.


Thank you very much for your time and kindly help.