Additional input:
length of the pipeline: 120 km
dia of pipe: 26 inch
HSD: 5.8 MMTPA & ATF 5.4 MMTPA to be transported through above mentioned common line.
velocity limit 1.75 m/s
pump station at source to boost the fluid to the end point with min of 5 barg pressure.
HSD density: 846 kg/m3
ATF density: 826 kg/m3.
how to find out the optimum no. of batches to keep min interface quantity per anum and to keep optimum capacity of receipt tanks?
Appreciate your valuble suggistions....