Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Packed-Bed Scrubber Design For Hcl And Acetyl Chloride With Water

scrubbers shutdown startup scrubbers installation hcl scrubber acetyl chloride scrubber packed bed scrubber packed-bed scrubbers design

This topic has been archived. This means that you cannot reply to this topic.
1 reply to this topic
Share this topic:
| More

#1 Yous Dani

Yous Dani

    Brand New Member

  • Members
  • 1 posts

Posted 16 February 2012 - 07:39 PM

Hi
I have to design 2 packed-bed scrubbers one for acetyl chloride and the second one is for HCl (scrubbing with water) , I need any related info about designing such as ,sizing ,Control ,installation ,P&ID , VLE data ...

Thanks in advance

Best regards
D.Y.

#2 Arpit_Jain

Arpit_Jain

    Veteran Member

  • Members
  • 46 posts

Posted 17 February 2012 - 02:34 AM

Refer "Systematic Methods of Chemical Process Design by Biegler, Grossmann, Westerberg for scrubber design calculation (Chapter 3)




Similar Topics