plant startup plant shutdown start up shut down refinery refineries process start up equipment shut down equipment start up distillation column

This topic has been archived. This means that you cannot reply to this topic.
1 reply to this topic
Share this topic:
| More

#1 flangecoupling

flangecoupling

    Veteran Member

  • Members
  • 38 posts

Posted 26 December 2012 - 03:36 AM

Hello Every One,

I am working on dynamic simulations catering to OTS requirements of various industries. For the time being I have worked on the modeling side, now I am moving to plant start up and shutdown testing using DCS interface. For this I was looking for some general & simplified start up and shutdown procedures for different units of an industry (majorly refineries). For example starting up a distillation column or more specifically a CDU, starting up VL seperators, starting up LL seperators, Starting up VLL seperators, starting up Reactors (some procedures for specific reactors will be very helpful) and so forth. Also with this I am looking for shut down procedures of plant units.

I hope that I have described my requirement clearly. Any help will be very very much appreciated.

Anyone having the required data, just tell me and I will message my email add.

Thanks & Regards

Edited by flangecoupling, 26 December 2012 - 03:42 AM.


#2 flangecoupling

flangecoupling

    Veteran Member

  • Members
  • 38 posts

Posted 26 December 2012 - 04:25 AM

Just to add up, some general start up procedures for rotating equipment for example compressors, multi stage compressors will be very helpful. Thanks