Dear Art,
Sorry i dont know how to say but let me explain for the first time i was using the forum like this. so i did mistakes which i will not repeat again.
Regqrding your doubts let me clear.
1. i came to congo a month ago and joined in Co2 plant as a enginner, as i said earlier i dont have experience in CO2.
2. This CO2 plant was designed and fabricated by Ashirwad Carbonic Industries India.
3. This plant was commisined in 2011 may
4. I have seen all the equipments and process of this CO2.
5. Operation and maintanance manuals are not supplied by client, the only basic data like the process description and design data and the two PID sheets which i have forwarded you.
6. i have gone through the process and studied the basic information from google such as Whittmann, sanghi, Unino engg and Bush websites.
So i now i am attaching the process flow diagram in excel as told by you and the process is
First the air and diesel fuel is fed seperately to burner where thy are mixed and then is burned. the flue gas consisting primarly of N2 and co2.this FG is passed through Scrubber where temperature is reduced and SOX are removed by additon of soda ash contionously with the help of metering pump and to maitain level there is a makeup water line.
Then FG is fed to absorber tower where it comes in contact with 15 percent MEA conc, which absorbs CO2 into the solution. the N2 gas leaveing the top of absorber passes through a demister and exhaust hood.
The rich amine sol which ahs absorbed the CO2 is circulated from absorber through a continious regenration system consisting of a stripper and a regenerator where the CO2 is stripped from MEA sol.
This isaccomplished by MES/steam vapours generated in regenerator rising up through the stripper tower Countercurrent to rich sol fed from top of stripper.
The co2 lean sol existing the regenerator is then cooled and recirculate to the absorber to again absorb co2
the co2 gas existing the regenrator system is sent furthur cooled and purification unit where the gas is paased to KMNO4 tower and activated carbon tower and then to a co2 compresoor and again to remove any moisture content it is passed to automated Dryer consting of activated alumina and is snet to storage.
Thanks for the reply in the attached execl file by you saying "
I have already replied with important information that corrects and redefines what data you sent in" but i have still doubts in that
1.If there is 25 oC cooling water supply available, why the absorber allowed to operate at such a higher pressure? With this CWS, the absorber should be running no higher than 30-35 oC - which would greatly increase the amount of CO2 absorbed in the absorber.
yes but the temperature of absorber is maintaing around 45-50°C. so was not able to understand how to minimise this temperatureLean MEA from the "Reactivator" (
yes its a direct-fired reboiler) is too hot; the pressure in the stripper is too high.
The operating pressure of the stripper is around 0.6-1.2 kg/cm2. is it too high...???? i have observed that lowering the preesue in regenerator the MEA entering into putification train. there is a back pressure contorl valve before the purification train but even though co2 compressor suction pr is maitaing at 0.1-0.25 kg/cm2 MEA entering the Purification train
i hope i have answered all your questions and still if you feels like somthing missing kindly let me know. i just trying to imporve my skills and want to be a good chemical enginner.
Requesting you kindly accept my sorry.
Regards
A Ravi