#1 sajju

sajju

    Veteran Member

  • Members
  • 37 posts

Posted 15 June 2013 - 05:53 AM

hello

 

can any one suggest what is the Material of construction used for 36%HCL and 28%HCL of capacity 3000gal

 

thank you



#2 mansari

mansari

    Veteran Member

  • Store Customers
  • 46 posts

Posted 15 June 2013 - 06:04 AM

Rubber lined carbon steel is a good option.



#3 fallah

fallah

    Gold Member

  • ChE Plus Subscriber
  • 5,019 posts

Posted 15 June 2013 - 06:09 AM

ashrath,

 

1-Epoxy lined steel

2-GRP lined with PP or PVC


Edited by fallah, 15 June 2013 - 06:10 AM.


#4 breizh

breizh

    Gold Member

  • Admin
  • 6,716 posts

Posted 15 June 2013 - 08:53 AM

Hope this helps you out .

Breizh

 



#5 Satyajit

Satyajit

    Gold Member

  • Members
  • 87 posts

Posted 15 June 2013 - 04:37 PM

Dear Ashrath,

                        MSRL or CSRL tanks ( rubber lined ) are not successful to resist corrosion in long run; I have seen damage of rubber layers after 3-4 years of operation; non metallic tanks are recommended. It may be difficult to fabricate  but can resist corrosion. Hypo should not be stored for a long time as it is very unstable at high temperature and loses chlorine to the atmosphere and therby reduces the strength of Hypo from 12-14% to a very low level ( based on equlibrium properties). A  sun shed is a must .

 

Another important point in this tank design is to minimise number of flanges as the flanges are prone to leakage; I have experinced leakages in flanges and also pinhole leakages in lines/pumps/valves very often after few years of operation. I do recommend to have a common level trolley for LG,LI/LT and level switches.

 

3rd point is to install a solenoid operated valve ( DCS/ESD operated) on tank filling line with a start pernissive to open and close at tank high level  for safety reason.

Kind regards,

Satyajit



#6 sajju

sajju

    Veteran Member

  • Members
  • 37 posts

Posted 18 June 2013 - 03:30 AM

thakyou for your valuable suggestions

 

@

mansari,Satyajit,breizh,breizh