Guys, I want to know if we can merge a glycol drain system with a closed drain.
I mean, can we send glycol drains from the glycol dehydration package to the closed drain system? I have seen a separate glycol drain vessel on an onshore facility, where this vessel was sized for total glycol inventory in the system. But here I am particularly inquiring about an offshore facility, where there is space limitation and the closed drain discharges its content to the main oil line. So my basic query is: can we allow the draining of pure glycol into the offshore’s closed drain system, since the dehydration system is scheduled for a revamp?
Regards,
varun
Edited by Art Montemayor, 22 August 2013 - 07:02 AM.
content, grammar, typos