Determine Peak Leakage Rate Of Control Valve For Psv Sizing
#1
Posted 24 July 2017 - 12:41 AM
#2
Posted 24 July 2017 - 10:44 AM
A sketch or drawing is necessary for us to provide help. And is this in design phase?
Bobby
#3
Posted 25 July 2017 - 11:20 AM
I would calculate the peak rate with both valves 100% open. You must protect the system for this scenario. Sometimes valves are opened all the way on purpose and not just because of valve failure. Your equipment must be protected from overpressure for all reasonable scenarios. If these are control valves, the control system might open both valves because of misleading instruments.
#4
Posted 26 July 2017 - 05:11 AM
Hi Bobby & Pilesar
Thank you very much for your help
i'm based on your comments to refer some standards and select Class IV tightness leakage to calculate PSV at downstream system
So sorry because i dont know how to load photo to clarity my issue.
Warm regards!
#5
Posted 26 July 2017 - 09:04 AM
I think you missed Pilesar's point.
#6
Posted 31 July 2017 - 03:31 AM
Hi Bobby,
As my understanding. We are have a Pressure Regulator System includes two series Control Valves installation for regulating gas from:
110-137 barg -> to 86 barg
Q range: 1.01 - 18.0 MMSCMD
My mention above is set for first Control vale FC/ Second one is FO. and they are sized of 10 inch
If two CVs are FO meaning full gas flow of 18 MMSCMD goes to down stream & PSV is very bigger than PSV sets for leakage case
I think Vendor to confirm about this guarantee. Right?
By the way, if i have a Fuel Gas system including two CV1 (set @ 8.5barg); CV2 (Set @8barg) route gas to Scrubber.
If Cv Failure Open. PSV will open to protect Scrubber. I would like to know how much gas flow for relief case.
is gas flow assumed from one CV or two CVs. Pls help me clarify this issue
Thanks & Regards
#7
Posted 03 August 2017 - 12:38 PM
Hi Bobby,
As my understanding. We are have a Pressure Regulator System includes two series Control Valves installation for regulating gas from:
110-137 barg -> to 86 barg
Q range: 1.01 - 18.0 MMSCMD
My mention above is set for first Control vale FC/ Second one is FO. and they are sized of 10 inch
If two CVs are FO meaning full gas flow of 18 MMSCMD goes to down stream & PSV is very bigger than PSV sets for leakage case
I think Vendor to confirm about this guarantee. Right?
By the way, if i have a Fuel Gas system including two CV1 (set @ 8.5barg); CV2 (Set @8barg) route gas to Scrubber.
If Cv Failure Open. PSV will open to protect Scrubber. I would like to know how much gas flow for relief case.
is gas flow assumed from one CV or two CVs. Pls help me clarify this issue
Thanks & Regards
Namvuvu,
You need to understand your control how is it working. Are these control valve could opened simultaneously in case or controller failure, or only one valve could open. This is also pointed out by Pilesar
"If these are control valves, the control system might open both valves because of misleading instruments."
Two valve could be opened together, 100% open, and lead to over pressure on scrubber. Your flow rate could go much higher than control valve capacity. Flow rate could go higher than 130-160% of control valve capacity (depend on rated CV value of control valve). In this case, if two control valve fail together, potentially relieving rate could be 260-320% of one control valve capacity. And this is not good.
Pilesar, once again pointed out this concern. And this is true. It can happen if it is not designed properly.
Your equipment must be protected from overpressure for all reasonable scenarios.
I or Pilesar could not say whether PSV should be sized for two control valve or one control valve because we do not know your control system work. Sketches would be better to describe how your control work, or PID drawing would be better.
Alex
#8
Posted 23 August 2017 - 10:35 PM
Hi Alexsandres; Pilesar
The attached files are shown control valves configuration.
Hopefully your supports to clarify my issues
Regards,
Namvuvu
Attached Files
#9
Posted 24 August 2017 - 12:14 AM
I would calculate the peak rate with both valves 100% open. You must protect the system for this scenario. Sometimes valves are opened all the way on purpose and not just because of valve failure. Your equipment must be protected from overpressure for all reasonable scenarios. If these are control valves, the control system might open both valves because of misleading instruments.
If the PV's have dedicated control loop and one of them is FO while another one is FC; then to take two PV's simultaneously in full open position as worst case is going to double jeopardy conditions which cannot be acceptable, because in instrument air failure case only one PV would be in full open position and simultaneous loops malfunctions leading to two PV's in full open position is rarely occurred.
Hence, appears taking each PV in full open position and another one in normal position and select the case with higher passing flow among these two cases as relevant PSV sizing basis could be more reasonable.
#10
Posted 24 August 2017 - 05:09 PM
It appears to me that you should enlist a professional to help if you follow Naser's advice. The upstream valve will be fully open in normal operation. I always premise that all valves remain in their normal operating position when another valve fails. Be careful. And investigate the use of HIPPS to protect the system against overpressure. If I designed your system, I would specify that both valves fail closed, too.
Bobby
Edited by Bobby Strain, 25 August 2017 - 09:37 AM.
#11
Posted 27 August 2017 - 08:27 PM
I would calculate the peak rate with both valves 100% open. You must protect the system for this scenario. Sometimes valves are opened all the way on purpose and not just because of valve failure. Your equipment must be protected from overpressure for all reasonable scenarios. If these are control valves, the control system might open both valves because of misleading instruments.
If the PV's have dedicated control loop and one of them is FO while another one is FC; then to take two PV's simultaneously in full open position as worst case is going to double jeopardy conditions which cannot be acceptable, because in instrument air failure case only one PV would be in full open position and simultaneous loops malfunctions leading to two PV's in full open position is rarely occurred.
Hence, appears taking each PV in full open position and another one in normal position and select the case with higher passing flow among these two cases as relevant PSV sizing basis could be more reasonable.
Mr. Fallah & Mr. Bobby,
Thanks for your helps,
i have conducted double check with Instrument team and specified the notes for control loop function in specification & DTSheet to make sure these valve operating abide by requirement. Besides, the later issue will discuss in working with Valve Vendor next stage.
Regards,
Namvuvu
Edited by namvuvu29, 27 August 2017 - 08:28 PM.
#12
Posted 27 August 2017 - 09:04 PM
So, what did you conclude?
Bobby
#13
Posted 28 August 2017 - 12:21 AM
I would calculate the peak rate with both valves 100% open. You must protect the system for this scenario. Sometimes valves are opened all the way on purpose and not just because of valve failure. Your equipment must be protected from overpressure for all reasonable scenarios. If these are control valves, the control system might open both valves because of misleading instruments.
If the PV's have dedicated control loop and one of them is FO while another one is FC; then to take two PV's simultaneously in full open position as worst case is going to double jeopardy conditions which cannot be acceptable, because in instrument air failure case only one PV would be in full open position and simultaneous loops malfunctions leading to two PV's in full open position is rarely occurred.
Hence, appears taking each PV in full open position and another one in normal position and select the case with higher passing flow among these two cases as relevant PSV sizing basis could be more reasonable.
There may be case when FO valve is 100% and FC is struck open/malfunction open . Why we are not considering malfuction of control valve irrespective of the fail safe condition. When Control valve achieves fail safe condition in case of air failure that means that control valve is working perfectly well but there may be chances when it will malfunction/struck Close/Open irrespective of FO/FC.
#14
Posted 28 August 2017 - 12:57 AM
There may be case when FO valve is 100% and FC is struck open/malfunction open . Why we are not considering malfuction of control valve irrespective of the fail safe condition. When Control valve achieves fail safe condition in case of air failure that means that control valve is working perfectly well but there may be chances when it will malfunction/struck Close/Open irrespective of FO/FC.
For one valve is ok; but two or more valves are rarely considered to be stuck full open simultaneously...
#15
Posted 28 August 2017 - 04:28 AM
So, what did you conclude?
Bobby
Mr Bobby,
We decided to keep configuration one PCV (FO), another one (FC) and just sizing PSV for valve leakage only. It has to require in DTSheet for instrument.
#16
Posted 28 August 2017 - 08:49 AM
When this forum is consulted by others as a reference in the future, I hope they realize that just because someone asks for advice and then decides on a course of action does not mean that the correct conclusion was reached. Determining equipment overpressure protection is a grave responsibility and this example should not be used as a go-by.
#17
Posted 28 August 2017 - 01:52 PM
And the conclusion is in error. So you take full responsibility. We don't know what you mean by leakage rate as you never told us. But you won't hear more from me on this subject.
Bobby
#18
Posted 29 August 2017 - 04:55 AM
And the conclusion is in error. So you take full responsibility. We don't know what you mean by leakage rate as you never told us. But you won't hear more from me on this subject.
Bobby
Bobby & Pilesar,
i dont know why you say me like that.
As far i mentioned in above content:
i have two issues when i need to help:
1. Determine which case for PSV sizing (i mean PCV failure open or PCV failure leakage) when installation a series two PCV (one set FO, another one set FC). According to discuss i appreciate all your help especially Fallah's experience. I double check with Instrument team and they take notes in attachment file. Meanwhile PCV leakage for Class IV in case of failure. That's why i will use it for sizing PSV with flowrate Cv_select = 0.01*Cv rate of PCV
2. For two PCV install parallel (i.e IG/FG system). I asked about flowrate using for PSV sizing mount on Scrubber. and advice receives is Q using for PSV takes in account for one PCV FO + one PCV normal operating
i dont know how to conclusion is in error. Help me clarify your opinion?
Attached Files
Edited by namvuvu29, 29 August 2017 - 05:00 AM.
Similar Topics
![]() Liquid Liquid Separator SizingStarted by Guest_Kentucky08_* , 03 Apr 2025 |
|
![]() |
||
Check Valve FailureStarted by Guest_Falah_* , 26 Mar 2025 |
|
![]() |
||
Alkaline Electrolytic Cell/stack Sizing/design For H2 ProductionStarted by Guest_BRS09_* , 13 Mar 2025 |
|
![]() |
||
Multiport Selector Valve (Msv)Started by Guest__1angelia23_* , 12 Mar 2025 |
|
![]() |
||
Batch Adsorption: H/d Ratio For Vessel SizingStarted by Guest_Victor_process_Engineer_* , 28 Feb 2025 |
|
![]() |