Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

0

Btex Carryover & Partitioning In Hysys

btex lng gas processing

No replies to this topic
Share this topic:
| More

#1 billybedeveril

billybedeveril

    Brand New Member

  • Members
  • 9 posts

Posted 15 March 2019 - 05:35 AM

I'm currently looking at an offshore gas field with processing to feed lean gas to an onshore LNG facility. The offshore facility carries out dehydration and HC dewpointing to achieve the required pipeline water and dewpoint specifications.

 

There is a potential issue with BTEX arriving at the LNG facility, and I'm trying to quantify the ppm levels into the plant. What I'm unsure of is how much confidence I can have in what HYSYS is telling me. As we are down to PPM levels, can I trust the partitioning of BTEX into the condensate stream offshore? Or should I be considering some margin? Are there alternative ways or norms/standards for estimating BTEX carryover? 

 

Any help much appreciated. 

 

Thanks






Similar Topics