Hi all,
I am currently performing Study to operate our Plant at higher capacity than design.
Design Factor= 120 %
DBN Factor = 130%
During this study when I did Mass balance, I came to know that for 10 % increase in Flow capacity I have sufficient margin in Pump & also Same control Valves can be used with available margin.
Also for PSV having Governing case as Fire, the Wetted Surface remains same, hence no need to check adequacy.
As I will not Change any Pump Or Control valve for high capacity operation & the Fire Case also don't needs to be revaluated being same wetted surface, do I need to do PSV adequacy check in this condition?
Your Quick reply will be highly appreciated.