Hi everyone,
I have recently encountered a situation in which API reported by hysys is different from what can be calculated manually. I have a three phase oil stream (gas+oil+water) @ standard conditions (60F and 1 atm).
As you see in the following screenshots, API is reported to be 25. However, by considering the densities of water and oil at that conditions and the formula "API=141.5/SG - 131.5", 12 will be achieved.
I do not know what the problem is. Isn't hysys calculating API according to the formula?
I appreciate your help in advance.