Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Indian Boiler Regulation


This topic has been archived. This means that you cannot reply to this topic.
2 replies to this topic
Share this topic:
| More

#1 VISHAL KHADKE

VISHAL KHADKE

    Junior Member

  • Members
  • 14 posts

Posted 02 September 2010 - 09:41 AM

We are planning to source a Steam Evaporator (Kettle type reboiler) from China which is heated with HTM fluid. Operating Steam Pressure will be 2.0 Barg.(Specs: Chinese GB Code). I want to know can we install it in India without getting IBR certification?
All the GB codes available with us are in Chinese and it is hard to get it in English. Therefore the necessary documents to apply for IBR certification are not available.
I would also like to know above what steam pressure IBR certification is mandatory?

#2 ankur2061

ankur2061

    Gold Member

  • Forum Moderator
  • 2,484 posts

Posted 02 September 2010 - 10:19 AM

Vishal,

I should warn you that you are fishing in dangerous waters. Any pressure vessel without LEGIBLE and CORRECT documentation is a recipe for disaster. If god forbid any accident occurs and your company needs to furnish the documentation to the legal authorities and are unable to, your company can face serious criminal proceedings including jail terms to the company personnel who were responsible for the purchase and installation of the equipment.

You should insist on the manufacturer to provide you documentation in English which is recognized as a major language for technical and commercial dealings worldwide.

I am not familiar with IBR code but the code itself is available from various sources and most Indian mechanical engineers who have worked in the power generation sector would be familiar with it.

Regards,
Ankur.

#3 VISHAL KHADKE

VISHAL KHADKE

    Junior Member

  • Members
  • 14 posts

Posted 02 September 2010 - 10:52 AM

Dear Sir,
Thank you. In fact we all are uncomfortable with this. We are almost decided to source all the pressure vessels from India and get it certified before taking into operation
Regards,
VISHAL KHADKE




Similar Topics