My system is designed to start-up fuel gas skid on platform (during about 8 hours only). It has two operating cases from two feed sources: one from Export Fiscal Metering (157 barg), the other from 1st Separator (65 barg).
Design pressure of Heater is 160 barg.
Please, see the attached file for more details
My question:
What is the real purpose of PSV?
Why the set pressure is so close to operating pressure (160 barg; 157 barg)?
Why the type of PSV is "THERMAL". But they (my seniors) told me that: "calculate it as FIRE CASE"?
Which criteria should I follow to sizing this PSV?
Thank you so much