Critical Equipments & There Vendors In An Ammonia Plant


This topic has been archived. This means that you cannot reply to this topic.
1 reply to this topic
Share this topic:
| More

#1 tarafdar

tarafdar

    Gold Member

  • Members
  • 69 posts

Posted 09 September 2011 - 12:51 PM

We are facing problem regarding selection of Critical Equipments & there Vendors.
There are about 150-160 equipments in an ammonia plant.Of these 30-35 equipments are identified as critical
equipment by Process Licensor.For critical equipments process licensor has some selected vendors.The vendor for other equipments are selected by mutual understanding between Owner & general cotractor.
In the Compex there are other auxiliary (Package) equipments like Boiler,Power plant,N2 generation plant etc. which are out of process licensor's scope.

We(owner) like to include the following equipments( Ammonia Plant) in the critical list :
1.HTS
2.LTS
3.CO2 Absorber
4.CO2 Stripper
5.Methanator
6.ID fan for Reforming section.
7.Feed Gas Compressor(NG booster compressor)& its driver turbine.
8.Refrigeration compressor & its driver turbine
Also the following Package Items we like to include in the critical list :
1.Boiler
2.Power Plant
3.N2 Generation
4.Instrument Air
5.Demineralization
6.Cooling Tower
7.Ammonia Storage Tank

When an equipment is identifyed as critical general contractor has to ensure the following points :
1.Sringent code & standards are to be followed.
2.Select Internationally raputed proven vendor(the vendor must have supplied same equipment in two similer projects which are in operation for last 5 years.)
3.For extremely critical items we want code stamping.GC dont agree for stamping.

Since this is an LSTK Project, general contractor like to keep critical equpments list short.Because for non-critical items GC has some freedom to choose vendors.
Problem is Process Licensor stated that they can not ensure quoted energy consumption figure if quality equipments are not choosen.

Now I like to have forum members suggestion on the following points :
1.What should be the criteria for selecting critical equipments?
2.Can we compromise with stamping regarding extremely critical equipments?
3.Is it logical for the Process Licensor to shift from there commitment regarding energy consumption giving an excuse of not selecting quality equipments?
4.For Compressors we like to have the same vendor for its driver turbine.For power plant similerly we want the same vendor for the Boiler,Generator& Steam Turbine(Available).We like to follow this srtatagy for future communication easy regarding maintenance.But GC dont agree.What should be our strategy?
5.How to select a good vendor?
.

#2 bhavinpatel

bhavinpatel

    Brand New Member

  • Members
  • 1 posts

Posted 28 April 2012 - 12:37 AM

We are facing problem regarding selection of Critical Equipments & there Vendors.
There are about 150-160 equipments in an ammonia plant.Of these 30-35 equipments are identified as critical
equipment by Process Licensor.For critical equipments process licensor has some selected vendors.The vendor for other equipments are selected by mutual understanding between Owner & general cotractor.
In the Compex there are other auxiliary (Package) equipments like Boiler,Power plant,N2 generation plant etc. which are out of process licensor's scope.

We(owner) like to include the following equipments( Ammonia Plant) in the critical list :
1.HTS
2.LTS
3.CO2 Absorber
4.CO2 Stripper
5.Methanator
6.ID fan for Reforming section.
7.Feed Gas Compressor(NG booster compressor)& its driver turbine.
8.Refrigeration compressor & its driver turbine
Also the following Package Items we like to include in the critical list :
1.Boiler
2.Power Plant
3.N2 Generation
4.Instrument Air
5.Demineralization
6.Cooling Tower
7.Ammonia Storage Tank

When an equipment is identifyed as critical general contractor has to ensure the following points :
1.Sringent code & standards are to be followed.
2.Select Internationally raputed proven vendor(the vendor must have supplied same equipment in two similer projects which are in operation for last 5 years.)
3.For extremely critical items we want code stamping.GC dont agree for stamping.

Since this is an LSTK Project, general contractor like to keep critical equpments list short.Because for non-critical items GC has some freedom to choose vendors.
Problem is Process Licensor stated that they can not ensure quoted energy consumption figure if quality equipments are not choosen.

Now I like to have forum members suggestion on the following points :
1.What should be the criteria for selecting critical equipments?
2.Can we compromise with stamping regarding extremely critical equipments?
3.Is it logical for the Process Licensor to shift from there commitment regarding energy consumption giving an excuse of not selecting quality equipments?
4.For Compressors we like to have the same vendor for its driver turbine.For power plant similerly we want the same vendor for the Boiler,Generator& Steam Turbine(Available).We like to follow this srtatagy for future communication easy regarding maintenance.But GC dont agree.What should be our strategy?
5.How to select a good vendor?
.



Hey we are in manufacturing of such equipments.
i am working with Essar Heavy engineering service from India.
You can write to me on bhavin.patel1@essar.com (my contact detail is 09909996337, 9825927537)

Regards,
Bhavin