hi guys
i have a problem about that
i have line with 82 km length from offshore @ 140 bar 40 C degree
recevied to onshore @ 81 bar 20 C degree
i have gas + condensates compositions and molar flow (1620 MMSCFD)
required:
1) Stop offshore production and calculate how long it will take to depressurize the line from 140 bar to 81 bar then from 81 bar to 1 atm , so i need the Equations to solve this problem
2) how can do that problem by HYSYS 3.1 from utility ( i know it should be 15 min but here in may case the time is required to calculate
any on can help me ?? as possible as fast plz
Regards
|
Offshore Line Depressurize
Started by Guest_Rashid_*, Aug 23 2005 03:59 PM
1 reply to this topic
Share this topic:
Similar Topics
Barometric Legs Line SizingStarted by Guest_panagiotis_* , 17 Mar 2023 |
|
|
||
Higher Pipe Line Dia Specification In UnisimStarted by Guest_Praveen Perumandla_* , 27 Feb 2024 |
|
|
||
Sizing Of Cooling Water Pipe LineStarted by Guest_Asif Azeez_* , 08 Jan 2021 |
|
|
||
Line Sizing CalculatorStarted by Guest_nhuthoahuynh13_* , 27 Nov 2023 |
|
|
||
Drain Line Sizing To Steam TrapStarted by Guest_RaifOzturk_* , 05 Jan 2024 |
|
|