hi guys
i have a problem about that
i have line with 82 km length from offshore @ 140 bar 40 C degree
recevied to onshore @ 81 bar 20 C degree
i have gas + condensates compositions and molar flow (1620 MMSCFD)
required:
1) Stop offshore production and calculate how long it will take to depressurize the line from 140 bar to 81 bar then from 81 bar to 1 atm , so i need the Equations to solve this problem
2) how can do that problem by HYSYS 3.1 from utility ( i know it should be 15 min but here in may case the time is required to calculate
any on can help me ?? as possible as fast plz
Regards
|
|
Offshore Line Depressurize
Started by Guest_Rashid_*, Aug 23 2005 03:59 PM
1 reply to this topic
Share this topic:
Similar Topics
Top Foam Pourer Line- Reducer ConnectionsStarted by Guest_RAFAELDAVE_0752_* , 03 Sep 2025 |
|
|
||
Ammonia Line Vapor GenerationStarted by Guest_simadri_* , 07 Apr 2025 |
|
|
||
Flow Through Normally No Flow LineStarted by Guest_iippure_* , 08 Apr 2025 |
|
|
||
Inlet Line Not Free DrainingStarted by Guest_Asifdcet_* , 07 Apr 2025 |
|
|
||
Improving Safety By Re-Routing Priming Vent Line In Centrifugal Pump HStarted by Guest_Srinivas Agastheeswaran_* , 31 Jan 2025 |
|
|

FB