Does PED "grandfather" equipment and relief installations that pre-dated implementation of PED?
For example, Stoomwezen (Netherlands) allowed rupture disks to be set at 110% of MAWP, whereas that's not allowed in any of the current harmonized EU standards. Do the PED rules mandate that that disk be replaced with one that bursts no higher than MAWP?
If the existing disk is grandfathered, is it just that specific disk that's grandfathered or is the installation grandfathered? In other words, when the existing disk is replaced, does the replacement disk have to be designed according to current rules. Or, can replacement disks continue to be specified according to the original design code?
|
|
Pressure Equip Directive Compliance For Earlier Installations
Started by Lowflo, Dec 07 2011 04:21 PM
No replies to this topic
Share this topic:
#1
Posted 07 December 2011 - 04:21 PM
Similar Topics
Pressure BuildupStarted by Guest_Yankee_* , 31 Mar 2026 |
|
|
||
Spray Dryer Nozzle Issue – Pressure Increase And Fines IncreaseStarted by Guest_Ella2365_* , 24 Mar 2026 |
|
|
||
The Basis Of Calculation To 3% Pressure Loss At The Inlet Of PressureStarted by Guest_phoenixmoca_* , 14 Mar 2026 |
|
|
||
Mdmt Basis For Gas Let-Down From High-Pressure Storage (Non-Blowdown CStarted by Guest_naghizad_* , 27 Feb 2026 |
|
|
||
Steam Pots Cyclic Pressure Pulsation And Water HammeringStarted by Guest_Abdelilah_* , 07 Dec 2025 |
|
|

FB