Good morning all
Just wanted some thoughts on this:
What would it take to convert a conventional LNg regasifiation terminal to an export facility (that is just re-loading the LNG onto another vessel for export; not liquefaction). Any ideas on how much the conversion is required here?
Thanks!
Ogeds
|

Lng Regasification Terminal To Export Terminal
Started by Olaniyi, Mar 01 2012 03:01 AM
1 reply to this topic
Share this topic:
#1
Posted 01 March 2012 - 03:01 AM
#2
Posted 01 March 2012 - 07:46 PM
Ogeds:
The major equipment facilities you basically are starting with are:
The major equipment facilities you basically are starting with are:
- A seaport and its facitilies;
- Unloading lines;
- LNG metering facilities;
- Storage tanks;
- LNG pumps feeding vaporizers;
- LNG Vaporizers;
- Seawater pumping facilities (depending on the type of vaporization used);
- Gas metering facilities;
- Sales gas pipeline for transfer to transport pipelines.
- A seaport and its facitilies;
- Unloading lines (converted to shipping lines);
- LNG metering facilities;
- Storage tanks;
- LNG pumps (for use in transferring LNG between tanks and for export (these may not have enough capacity);
- Gas metering facilities;
- The Sales gas pipeline (converted reception of natural gas feed).
Similar Topics
Applicable Standard For Ethane Import And Regasification TerminalStarted by Guest_bisen1986_* , 19 Nov 2024 |
|
![]() |
||
Lng Regasification: Heat Exchanger Operating ConditionsStarted by Guest_wangdee.s_* , 17 Nov 2024 |
|
![]() |
||
Terminal Velocity Formula For Cube ParticlesStarted by Guest_jordan1111_* , 15 Jun 2023 |
|
![]() |
||
Export FlowsheetStarted by Guest_IreneLUNA_* , 05 Oct 2020 |
|
![]() |
||
![]() ![]() Back Pressure On Gas Export LineStarted by Guest_emekar_* , 22 Aug 2019 |
|
![]() |