John885 ,
For 2014 , you need to wait beginning of 2015 (Q1) to get the figure.
preliminary June 14 :576.2
Final May14 :574.3
June 13:564.8
Hope this helps
Breizh
Edited by breizh, 01 October 2014 - 01:00 AM.
|
|
Posted 30 September 2014 - 11:34 PM
John885 ,
For 2014 , you need to wait beginning of 2015 (Q1) to get the figure.
preliminary June 14 :576.2
Final May14 :574.3
June 13:564.8
Hope this helps
Breizh
Edited by breizh, 01 October 2014 - 01:00 AM.
Posted 03 October 2014 - 07:43 PM
Posted 17 August 2015 - 07:07 AM
Ineed CEPCI 2015
THANK YOU
Posted 17 August 2015 - 07:27 AM
Posted 14 September 2015 - 02:18 AM
Hi,
Wondering if anyone knows the latest Marshall and Swift Cost index? I would prefer the Marshall and Swift cost index for 2014.
Thanks
Free Pump Sizing Calculator For Preliminary Engineering ChecksStarted by Guest_Gonoklab_* , 16 Mar 2026 |
|
|
||
Free Pump Sizing Calculator For Preliminary Engineering ChecksStarted by Guest_Gonoklab_* , 16 Mar 2026 |
|
|
||
Ethylene Plant - Is The Dilution Steam Generation System An "unfirStarted by Guest_Alfreedo_* , 12 Mar 2026 |
|
|
||
Mastered Process EngineeringStarted by Guest_Boudinahh8777_* , 31 Oct 2025 |
|
|
||
Lpg Plant DesignStarted by Guest_betulche_* , 08 Mar 2026 |
|
|