#1 Yogesh Bhatt

Yogesh Bhatt

    Veteran Member

  • Members
  • 38 posts

Posted 13 December 2013 - 05:35 AM

Dear Experts!

 

Please share your thoughts on the points to remember while preparing detailed engineering P&ID from a FEED P&ID.

Thanks



#2 fallah

fallah

    Gold Member

  • ChE Plus Subscriber
  • 5,019 posts

Posted 13 December 2013 - 06:06 AM

Yogesh,

 

This query should be submitted in another forum of this site...



#3 paulhorth

paulhorth

    Gold Member

  • ChE Plus Subscriber
  • 396 posts

Posted 14 December 2013 - 11:14 AM

Yogesh,

 

I have attached a PID checklist typical of what I have worked with. A good FEED should include the features shown in the third column, though this quality is sometimes not achieved due to  time pressure. During detailed design the features shown in the fourth column are developed, in particular details of vendor packages as received after orders have been placed. The final column (AFC) should include all development during detailed design, including any HAZOP actions on vendor equipment,  and ideally with all holds removed (though this is not always possible). 

 

PaulAttached File  PID checklist.xls   38KB   257 downloads


Edited by paulhorth, 14 December 2013 - 11:17 AM.


#4 Yogesh Bhatt

Yogesh Bhatt

    Veteran Member

  • Members
  • 38 posts

Posted 15 December 2013 - 10:48 PM

Thank you very much gents!



#5 syed_chemical

syed_chemical

    Brand New Member

  • Members
  • 8 posts

Posted 17 December 2013 - 07:17 AM

Hi Yogesh

 

The FEED P&ID is detailed in EPC (detailed Engineering).

 

Some of the examples are

 

  • Vendor Information updation
  • All process and utility line sizing
  • Identification of Vents and Drains
  • Distribution P&ID development
  • HAZOP study and recommendations
  • Control Valve
  • Validation of FEED documents (if required)
  • Clearing HOLDs during FEED
  • Piping routing and developments will be shown on P&IDs
  • Equipment full information
  • utility requirement
  • and so on...

Regards

Syed



#6 Yogesh Bhatt

Yogesh Bhatt

    Veteran Member

  • Members
  • 38 posts

Posted 17 December 2013 - 11:51 PM

Thank you syed for your valuable input. :)