Hi all good people,
At what condition that we put flow transmitter downstream of the control and what condition we put the flow transmitter upstream of the control valve. Thank you.
|
Posted 23 February 2015 - 09:23 PM
Hi all good people,
At what condition that we put flow transmitter downstream of the control and what condition we put the flow transmitter upstream of the control valve. Thank you.
Posted 23 February 2015 - 10:56 PM
ezralh,
System I in the attached file (flow element at upstream of the control valve) is always preferred, because in system II there is the risk of measuring error due to non smooth moving of the fluid at control valve downstream.
Posted 24 February 2015 - 01:00 AM
Posted 24 February 2015 - 11:44 PM
Hi everyone,
System -1 is always acceptable. As Fluid moves, flow tranmitter will measure & gives signal to accurately take an action for Control Valve. Hence, reading will be correct. There will not be time lag.
System-2 is unacceptable. As fluid moves, to take an action control valve has to wait till signal comes from its downstream side transmitter,
meanwhile some more flow would have passed through control valve. Here, there will be time lag. Hence, control function would not proper response as per desired result.
Your comments are highly appreciated.
Regards,
SPC
Posted 28 February 2015 - 11:18 AM
Critical Pressure For Choke Valve SizingStarted by Guest_Sherif Morsi_* , 07 Nov 2017 |
|
![]() |
||
Heat Exchanger Steam FlowStarted by Guest_aliebrahem17_* , 25 Nov 2024 |
|
![]() |
||
![]() Flow Through Normally No Flow LineStarted by Guest_iippure_* , 08 Apr 2025 |
|
![]() |
||
![]() Flare Header Reverse FlowStarted by Guest_Ahmadhamzahperta_* , 04 Apr 2025 |
|
![]() |
||
![]() Dynamic Simulation After Feed Flow ReductionStarted by Guest_Kakashi-01_* , 20 Mar 2025 |
|
![]() |