Please advice if in a revamp plant hydro testing needs to be done again if design pressure of the system has increased due to new shut off conditions of new pump being installed in the system.
Earlier design pressure of the system is 6 barg, hydro test pressure 1.5 times so 9 barg.
New design pressure is 7.2 barg based on new operating condition and new pump shut off. Can an exception be taken on the grounds that new design pressure is still less than test pressure and It is 150 pound rating piping.
|
|
Hydro Testing Required Again If Design Pressure Is Increased
Started by Sumun, Jun 04 2016 05:22 AM
1 reply to this topic
Share this topic:
Similar Topics
Pressure BuildupStarted by Guest_Yankee_* , 31 Mar 2026 |
|
|
||
Spray Dryer Nozzle Issue – Pressure Increase And Fines IncreaseStarted by Guest_Ella2365_* , 24 Mar 2026 |
|
|
||
The Basis Of Calculation To 3% Pressure Loss At The Inlet Of PressureStarted by Guest_phoenixmoca_* , 14 Mar 2026 |
|
|
||
Scrubber DesignStarted by Guest_syamsundar_menon_* , 02 Jul 2018 |
|
|
||
Lpg Plant DesignStarted by Guest_betulche_* , 08 Mar 2026 |
|
|

FB