Please advice if in a revamp plant hydro testing needs to be done again if design pressure of the system has increased due to new shut off conditions of new pump being installed in the system.
Earlier design pressure of the system is 6 barg, hydro test pressure 1.5 times so 9 barg.
New design pressure is 7.2 barg based on new operating condition and new pump shut off. Can an exception be taken on the grounds that new design pressure is still less than test pressure and It is 150 pound rating piping.
|
Hydro Testing Required Again If Design Pressure Is Increased
Started by Sumun, Jun 04 2016 05:22 AM
1 reply to this topic
Share this topic:
Similar Topics
Valves On Low Pressure Steam ServiceStarted by Guest_Ali4269278331_* , 15 Apr 2024 |
|
|
||
Design And Fabrication Of Reflux DrumStarted by Guest_Femi_* , 22 Apr 2024 |
|
|
||
Jt Based Hcdp Design V/s Mechanical Refrigeration Hcdp Unit.Started by Guest_BabRafiq1_* , 19 Apr 2024 |
|
|
||
Answered
Steam Pressure Requirements For Limpet Batch ReactorStarted by Guest_golegolegole_* , 10 Apr 2024 |
|
|
||
Rupture Disc DesignStarted by Guest_chaupradip_* , 13 Apr 2024 |
|
|