Dear all,
We have a problem. We have a 3 MMSMCD (105 MMSCFD) dew point plant (PFD attached).
The field is old and we will be approaching 1 MMSMCD (35.3 MMSCFD) gas production in two years, it is 30% of installed capacity.
Which problema could I have? Which equipment is critical and need to be revised/adjusted?
If you want/can, I would like to receive where a need to read about this topic (links, white papes, recommended papers or books, et)
Thanks in advance
Ariel