Dear All,
I am working as a process engineer in a gas processing plant.Our plant is designed to process 30 MMSCFD natural gas .It has two units one is Amine (MDEA) based gas sweetening and other is TEG based Gas Dy-hydration Unit.We are going to relocate this Amine Gas Sweetening plant to some other place which has kind of same day temperature while wind velocity at the new site is almost 100mph. The night temperature in summer is quite low at the night due to its only 20KM distance from the sea.There are installed shell and tube heat ex-changers to cool down the gas as well as Lean Amine.
My main question is about finding the right amount of flow rate keeping in mind the already designed cooling tower system.We have a cooling tower whose refrigeration capacity is 750 Tons.
I am sharing the re-boiler heat duty as well the heat duties of other heat ex-changers involved in the process system.There are three heat ex-changers which are installed in cooling tower ;
- Lean Amine Cooler with water as cooling medium.The design sheet is attached with same name.
Heat Exchangers of Amine Unit Data Sheet.pdf 277.41KB 45 downloads
- Amine Re-flux Condenser .The design sheet is present in
Heat Exchangers of Amine Unit Data Sheet.pdf 277.41KB 45 downloads
- Sweet Gas Cooler.The design sheet is present in
Heat Exchangers of Amine Unit Data Sheet.pdf 277.41KB 45 downloads
I am also attaching the P&IDs of the amine unit on which the operating/design parameters of temperature,pressure and heat duty are given.
08002-5006-Rev 2.pdf 386.38KB
25 downloads
08002-5011 Rev 2.pdf 479.08KB
20 downloads
08002-5012-Rev 2.pdf 408.99KB
16 downloads
08002-5013-Rev 2(0).pdf 372.96KB
18 downloads
08002-5013-Rev 2.pdf 359.75KB
21 downloads
08002-5014-Rev 2.pdf 384.71KB
17 downloads
08002-5015-Rev 2.pdf 217.97KB
17 downloads
Now my question is that what should be the water flow rate in the supply header of cooling tower.The cooling tower is placed 150 ft away from the ex-changers.Will the cooling tower of 750 Tons capacity enough to achieve the required parameters as per data sheet of ex-changers.We have Pump capacity of circulating 1200 meter cube flow per hour.How many US gallons will be required as Make-up water.We have RO Water system of 10 m3 capacity.
Please suggest some other necessary information you think regarding relocation of plant should be under consideration.